Class 1 Railway Sperry rail crews

  • Sperry rail change out on mainline

  • Track patrol

 

Knelsen, Grande Prairie (loading site)

  • Construct new track

  • Construct and install main line switch

  • Construct derails

  • Surfacing crew

 

Agrocorp, Innisfail

  • Construct new track

  • Construct and install switches

  • Construct derails

 

Scotford yard, Scotford

  • 13,000' of new track construction

  • Construct 6 Turnouts

  • Reconfigure crossovers for yard

  • Surfacing crew

  • Thermite welding

 

Tenaris, Grande Prairie

  • Mainline switch installs

  • Surfacing crew

  • Thermite welding

 

Knelsen, Grande Prairie

  • Main line switch install

  • Thermite welding

  • 1700' of new track construction

  • Surfacing crew

 

Chetwynd, B.C

  • Construct new track

  • Thermite welding

  • Construct and install main line switch

  • Surfacing  

 

Class 1 Railway Gauging crew

  • Re-gauge mainline track

  • Spiker machine, glue machine, adzer

 

Class 1 Railway Tie changing

  • Change out defective ties

  • Change out plates

 

Ashcroft B.C

  • Pre-plating ties

  • Quality control

 

Edifice, Edmonton

  • Complete remaining construction Spring 2017

 

Kleysen, Edmonton

  • Complete remaining construction Spring 2017

 

Class 1 Railway Pads and Insulators

  • Changing Pads and Insulators on CN mainline

  • Track protection

 

Class 1 Railway Sperry rails

  • Change out defective rails

  • Track protection

     