2017
Click highlighted for photos below
Class 1 Railway Sperry rail crews
-
Sperry rail change out on mainline
-
Track patrol
Knelsen, Grande Prairie (loading site)
-
Construct new track
-
Construct and install main line switch
-
Construct derails
-
Surfacing crew
-
Construct new track
-
Construct and install switches
-
Construct derails
-
13,000' of new track construction
-
Construct 6 Turnouts
-
Reconfigure crossovers for yard
-
Surfacing crew
-
Thermite welding
-
Mainline switch installs
-
Surfacing crew
-
Thermite welding
-
Main line switch install
-
Thermite welding
-
1700' of new track construction
-
Surfacing crew
-
Construct new track
-
Thermite welding
-
Construct and install main line switch
-
Surfacing
-
Re-gauge mainline track
-
Spiker machine, glue machine, adzer
-
Change out defective ties
-
Change out plates
-
Pre-plating ties
-
Quality control
-
Complete remaining construction Spring 2017
-
Complete remaining construction Spring 2017
Class 1 Railway Pads and Insulators
-
Changing Pads and Insulators on CN mainline
-
Track protection
-
Change out defective rails
-
Track protection