Manning Realignment

Due to issues with grade integrity, traffic had to be rerouted to a more stable grade. A new track was constructed, followed by a lineover and surfacing to complete the transition.

  • Construct 3200 TF of new track
  • Realign existing track to connect to new track
  • Ballast Track
  • Destressing Track
  • Surfacing Crew
  • Dismantle 3200 TF of existing mainline