St.Albert Ray Gibbons Expansion
Including panel construction, installation, welding, concrete crossing installation and final surfacing to design geometry.
Scope of Work:
- Construct new track panels
- Install track panels in the mainline
- Perform thermite welding of all panel joints
- Surface all installed track to final design geometry
- Supply and install concrete crossing panels