Edifice, Edmonton

  • 2500 TF of new construction

  • Construct 5 turnouts

  • Install mainline turnout

  • Ballast/Surface

 

Kleysen, Edmonton

  • 5000 TF of new construction

  • Construct 3 turnouts

  • Install mainline turnout

  • Re-alignment of existing track

  • Ballast/Surface

 

 BC Hyrdo Site C siding, Fort St.John

  • 8000 TF of new construction

  • Construct 5 turnouts

  • Construct 2 switch point derails

  • 150 thermite welds

  • Install mainline turnouts

  • Ballast/Surface

 

 Great Western Rail, Saskatchewan

  • Construct 2000 TF of new construction

  • Move existing main line switches

  • Construct 1 turnout

 

Class 1 Railway Edson sub 2016 

  • Remove/Install pads and insulators

 

On-Track Fort Saskatchewan 2016

  • 9000 TF of new construction

  • 1000 TF tear up

  • Construct and install 5 turnout

  • Surfacing crew/Ballasting

 

Class 1 Railway Lashburn SK, Altex 2016

  • Install insulated joint bars

  • Insulate existing switch

 

Class 1 Railway Lashburn SK, Altex 2016

  • Surface crew

  • Install crossing

  • Rail change out