2016
Edifice, Edmonton
-
2500 TF of new construction
-
Construct 5 turnouts
-
Install mainline turnout
-
Ballast/Surface
Kleysen, Edmonton
-
5000 TF of new construction
-
Construct 3 turnouts
-
Install mainline turnout
-
Re-alignment of existing track
-
Ballast/Surface
BC Hyrdo Site C siding, Fort St.John
-
8000 TF of new construction
-
Construct 5 turnouts
-
Construct 2 switch point derails
-
150 thermite welds
-
Install mainline turnouts
-
Ballast/Surface
Great Western Rail, Saskatchewan
-
Construct 2000 TF of new construction
-
Move existing main line switches
-
Construct 1 turnout
Class 1 Railway Edson sub 2016
-
Remove/Install pads and insulators
On-Track Fort Saskatchewan 2016
-
9000 TF of new construction
-
1000 TF tear up
-
Construct and install 5 turnout
-
Surfacing crew/Ballasting
Class 1 Railway Lashburn SK, Altex 2016
-
Install insulated joint bars
-
Insulate existing switch
Class 1 Railway Lashburn SK, Altex 2016
-
Surface crew
-
Install crossing
-
Rail change out