2015
Watrous tear up Saskatoon, Sk 2015
-
Remove 3 switches/straight rail
-
Tear up 3000 track feet
-
-
Stock pile all material
Direct fixation/Loading bay Thunderbay, Ont 2015
-
Raised track with support lags
-
Formed/poured plinths
-
14 Thermite welds
Class 1 Railway Thermite welding Alberta locations
-
Destress rail
-
Thermite weld
-
500+ Successful welds in 2015 with 0 failures
Class 1 Railway Various working crews
-
Switch installs
-
Panel installs
-
Construct track
-
Crossing installs
-
Call outs for derailments
-
Extra helping crews
-
Maintenance
Class 1 Railway Surfacing crew Edmonton, Ab
-
Resurfacing crew working throughout Edmonton and area
Class 1 Railway Tie change out crew
-
Various locations Edmonton and area 3000+
Mclennan yard extension
-
8000 TF of new construction
-
6000 LF rail change
-
Construct and install 2 mainline turnouts
-
Switch retirement
-
50 Thermite welds
-
Destressed track built
-
1000 Ties changed out
-
Surfacing crew/Ballasting
-
Track protection flagging
Mirror yard extension
-
8000 TF of new construction
-
Construct and install 2 mainline turnouts
-
30 Thermite welds
-
Destressed track built
-
800 Ties changed out
-
Upgrade existing track
-
Surfacing crew/Ballasting
-
Crossings built
-
Track protection flagging
Fort McMurray, Lynton yard extension
-
2000 TF of new construction
-
Construct and install turnout
-
6 Thermite welds
-
Surfacing crew/Ballasting
Haylakes, Siding extension
-
Track protection flagging
-
Surfacing crew/Ballasting
-
Destressed
-
180 Thermite welds
-
2000 TF tear up
-
Construct and install 2 mainline turnouts
-
13,000 TF of new construction