.png)



2019
Click highlighted for photos
​
Edmonton Yards
-
Construct and install 41 turnouts
-
Construct and replace 6 mainline crossovers
-
Removed 10+ switches
-
Upgrade switches
-
Surfacing crew
​
Vancouver Yards
-
Upgrade switches-Points, Stockrails, All steal and frogs
-
Install switch ties
-
Gauging
-
Install crossings
-
Construct new track off Bridge 300'
-
Surfacing all tracks
​
Flagging
-
Supplied Mainline Flagging for various companies throughout Alberta and Saskatchewan
​
Intermodal Yard Edmonton
-
Construct 15500' of Track
-
Construct and Install 10 Switches
-
Construct and Install 2 x #12 crossovers
-
Relocate #12 Crossovers
-
Line over existing track
-
Thermite weld and Distress
-
Surfacing crew
-
Pre plate Ties
​
IBS Yard Scotford
-
Construct 3400' of new track
-
Construct and Install #10 switch
-
Remove #10 switch
-
Line over existing tracks
-
Surface crew
Petrogas Track Construction
-
Construct and Install #12 Mainline switch
-
Construct and Install #12 Mainline crossovers
-
Remove #12 and #10 Switches
-
Construct and Install #10 Mainline switch
-
Line over existing track
-
Construct 8000' of new Mainline track
-
Construct and Install 2x Double switch point derails
-
Thermite weld and Distress
-
Surfacing crew
​
Class 1 Railway Boom Truck Support
-
Assist crews with Track work
-
Clean up scrap
-
Lay out material
​
Class 1 Railway Mainline Crossing upgrades various locations
-
Construct track panels
-
Install main line crossing panels
-
Surfacing Crews
​
G3 Terminal Morinville
-
Construct and Install Mainline #12 Switch
-
Thermite weld switch
-
Surfacing crew
​
Pembina Fort St.John
-
Construct and Install #8 Turnout
-
Rail change program
-
Tie change out program
-
Surfacing Crews
-
Construct crossings
​
Prince Rupert Grain Terminals
-
Tie change out program
-
Rai change program
-
Construct and Install #8 Switch
-
Surfacing Crews
-
Construct crossings
​
Apollo Pulp Mill Fort St.James
-
Tie change out program
-
Surfacing Crews
​
Canfor Pulp Mill Prince George
-
Tie change out program
-
Rai change program
-
Construct and Install #8 Switch
-
Surfacing Crews
-
Construct crossings
​
Fort Edmonton Park
-
Remove/Dismantle 7000' of track
-
Remove/Dismantle 4 switches
​
Canfor, Prince George
-
Construct 1700' of new construction
-
Construct and install 1 Switch
-
Construct and install 1 Switch point derail
​
Class 1 Railway Gauging Crew
-
Gauge mainline track throughout Alberta and Saskatchewan
​
Class 1 Railway Thermite Welding Crews
-
Thermite weld 10+ switches in Walker yard
-
Thermite weld switches on Wainwright East
​
Thermite Welding Various constructions jobs
-
Coal spur
-
Swan Landing
-
Scotford yard
-
Intermodel
-
Petrogas
​
​