top of page

2019

Click highlighted for photos

​

Edmonton Yards 

  • Construct and install 41 turnouts 

  • Construct and replace 6 mainline crossovers

  • Removed 10+ switches 

  • Upgrade switches

  • Surfacing crew

​

Vancouver Yards 

  • Upgrade switches-Points, Stockrails, All steal and frogs

  • Install switch ties

  • Gauging

  • Install crossings

  • Construct new track off Bridge 300'

  • Surfacing all tracks

​

Flagging

  • Supplied Mainline Flagging for various companies throughout Alberta and Saskatchewan 

​

Intermodal Yard Edmonton

  • Construct 15500' of Track

  • Construct and Install 10 Switches

  • Construct and Install 2 x #12 crossovers

  • Relocate #12 Crossovers

  • Line over existing track

  • Thermite weld and Distress

  • Surfacing crew

  • Pre plate Ties

​

IBS Yard Scotford

  • Construct 3400' of new track 

  • Construct and Install #10 switch

  • Remove #10 switch 

  • Line over existing tracks

  • Surface crew

 

Petrogas Track Construction

  • Construct and Install #12 Mainline switch

  • Construct and Install #12 Mainline crossovers

  • Remove #12 and #10 Switches

  • Construct and Install #10 Mainline switch

  • Line over existing track

  • Construct 8000' of new Mainline track

  • Construct and Install 2x Double switch point derails

  • Thermite weld and Distress

  • Surfacing crew

​

Class 1 Railway Boom Truck Support

  • Assist crews with Track work

  • Clean up scrap

  • Lay out material

​

Class 1 Railway Mainline Crossing upgrades various locations

  • Construct track panels

  • Install main line crossing panels 

  • Surfacing Crews

​

G3 Terminal Morinville

  • Construct and Install Mainline #12 Switch

  • Thermite weld switch

  • Surfacing crew

​

Pembina Fort St.John

  • Construct and Install #8 Turnout

  • Rail change program

  • Tie change out program

  • Surfacing Crews

  • Construct crossings 

​

Prince Rupert Grain Terminals

  • Tie change out program

  • Rai change program 

  • Construct and Install #8 Switch

  • Surfacing Crews

  • Construct crossings

​

Apollo Pulp Mill Fort St.James

  • Tie change out program

  • Surfacing Crews

​

Canfor Pulp Mill Prince George

  • Tie change out program

  • Rai change program 

  • Construct and Install #8 Switch

  • Surfacing Crews

  • Construct crossings

​

Fort Edmonton Park

  • Remove/Dismantle 7000' of track

  • Remove/Dismantle 4 switches

​

Canfor, Prince George

  • Construct 1700' of new construction

  • Construct and install 1 Switch

  • Construct and install 1 Switch point derail

​

Class 1 Railway Gauging Crew

  • Gauge mainline track throughout Alberta and Saskatchewan

​

Class 1 Railway Thermite Welding Crews

  • Thermite weld 10+ switches in Walker yard

  • Thermite weld switches on Wainwright East

​

Thermite Welding Various constructions jobs

  • Coal spur 

  • Swan Landing

  • Scotford yard

  • Intermodel

  • Petrogas

​

​

bottom of page