Edmonton Yards

  • Construct and install 36 turnouts 

  • Construct and replace 3 mainline crossovers

  • Removed 7+ switches 

  • Install crossings throughout yard

  • Upgrade switches

  • Change ties

  • Change out defective rails

  • Surfacing crew

Coal spur, Hinton

  • Construct 30,000 feet of new track

  • Construct/Install 2 mainline turnouts

  • Construct 2 turnouts and 1 crossover

  • Thermite weld

  • Surface track

 Swanlanding

  • Construct 5600 feet if new concrete track

  • Construct and install 2 turnouts

  • Thermite weld

  • Destress track

  • Surface track

 Scotford yard

  • Construct 8000 feet of new track

  • Construct and install 4 turnouts

  • Thermite weld

  • Surface track

  • Destress track

Wembley source energy, Grand prairie

  • Construct 6800 feet of new track

  • Construct and install 4 turnouts

  • Surface track

Class 1 Railway Sperry rail, Alberta 

  • ​Change out defective rails

Class 1 Railway Tie changing, AB/BC 

  • Change out defective ties

  • Tie changing equipment

Agrocorp, Innisfail

  • Change out defective ties

  • Change out defective rails

  • Surface track

Bunge

  • Construct track panels and install

  • Change defective rails

  • Change defective ties

Class 1 Railway Rail gang

  • Assist with spiker

  • Spike rail once changed

Class 1 Railway  Concrete Pads and insulators, Alberta

  • Change out worn pads and insulators

 

Class 1 Railway way Rail gang Flagging

  • Flagging for rail gang

Mainline flagging

  • Flagging for various grade contractors

Altex, Lashburn Sk

  • Lift and surface various locations

  • Maintain switches

  • Gauge spots

Scotford yard

  • Construct and install 2 crossovers

  • Construct turnouts 5

  • Thermite weld

  • Surface turnouts

Wainwright sub, Unity Sk.

  • Construct and Install mainline 4 turnouts

  • Thermite weld

  • Surface switch

Class 1 Railway Surfacing crews, Alberta

  • Surface defective locations